Designing Factory Layout & Approval

Necessary things are to be shown in the Layout Drawing to approve new as well as alternative drawing

  1. Site Plan or Location Map
  2. Front Elevation
  3. Section/Cross Section
  4. Machine Layout Plan
  5. Alternative Door/Stair/ Emergency Exit
  6. Ventilation, Doors, Windows & Exhaust Fan etc.
  7. Production Flow Chart
  8. It is mandatory to mentioned measurement of every Door/Stair/Emergency Exit Way/Path etc in the drawing Factory -3
  9. Separate Toilet of Male & Female (Toliet/25 workers)
  10. Separate Canteen of Male & Female, if applicable
  11. Separate Rest Room of Male & Female, if applicable
  12. Doctor’s Room & Dispensary, if applicable
  13. Crèche/Baby Care Room, if applicable
  14. Photocopy of previous Layout Plan which is approved by this Department, DIFE, if applicable

Factory Layout 2

Required documents for Layout Approval

  1. Trade License
  2. Rent Agreement/Land Mutation Copy
  3. NID of Applicant
  4. Soil Test Report of the land
  5. Structural Design/Drawing certified by Engineer/Architecture
  6. Load Bearing Certificate certified by Engineer/Architecture
  7. Occupancy Certificate certified by Engineer/Architecture
  8. Structural Design Approval by Local Authority